Opportunity: Glendo-Lusk Rural Tap and Quinn Creek Substation

Description 

Amendment (0002) Extend Solicitation Close Date, Update Bid Schedule, Specifications W/redline changes, Drawings, KMZ files, Geotechnical Report, and Q/A from industry.

Overview 
Reference number: 89503226BWA000073
Issue date: 06/17/2026
Response due: 08/14/2026 06:00 PM US/Eastern

Set Aside:
NAICS: 237130-Power and Communication Line and Related Structures Construction
PSC / FSC: Y1PZ-CONSTRUCTION OF OTHER NON-BUILDING FACILITIES

Agency: DOE

Contracting office:

Western Rocky Mountain Region
WAPA (RMR)
US DOE/Western Area Power
5555 E. Crossroads Blvd
Loveland, CO 80539-8986


Place of Performance:




Contact: John Pratt
Phone:
Fax:
Email: jpratt@wapa.gov

Vendors conference:

Location:



Details:



What do I do now?
This is the opportunity summary page. To the left you will see a description and an overview of this opportunity. To the right you will see a list of the attached documentation. To view any of the attachments, simply click the attachment name.



Registered Users
To register interest in this opportunity or to electronically respond, you must first sign in. Click the Sign In button below.





Non Registered Users
You can view this or any other public opportunity. However, registered users have numerous added benefits including the ability to submit questions to the agency, receive emails concerning updates and amendments, create and manage a response team and submit responses directly through this site.

Becoming a registered user is fast, free and takes only a few minutes. To get started, click the Register Now button below.

  




Documentation 
Skip attachment list.
Collapse 89503226BWA00007389503226BWA000073
Collapse Pre-solicitation NoticePre-solicitation Notice
Collapse SolicitationSolicitation
Overview
89503226BWA000073
022. Sol 89503226BWA000073
Attch A1. Specs_Part_1_of_6_Transmission_Line
Attch A2. Specs_Part_2_of_6_Substation_QCK_Final_REV01_260613
Attch A3. Specs_Part_3_of_6_Substation_APPENDIX_A
Attch A4. Specs_Part_4_of_6_Substation_APPENDIX_B
Attch A5. Specs_Cont.Commisioning.Report
Attch A6. Specs_APPENDIX_D_QCK_Geotechnical_Report
Attch B1. Drawings_Part_1_of_3_Transmission_Line_(wo_access_maps)_260612
Attch B2. Drawings_Part_2_of_3_Substation_QCK_FINAL_REV00_241016
Attch B3. Drawings_Part_3_of_3_Building_and_Controls_QCK_FINAL_REV00_250312
Attch C1. Bid_Schedule_Part_1_of_2_Transmission_Line_GLD-QCK-LRT_REV00_260413
Attch C2. Bid_Schedule_Part_2_of_2_Substation_QCK_REV01_260612
Attch D. ENV_CX_2019-028 GLD-QCK-LRT
Attch E1. WD Platte-Niobrara Cnty, WY (Bldg) WY20260041 05.18.2026
Attch E2. WD Platte-Niobrara Cnty, WY (Hvy-Hwy) WY20260044 05.18.2026
Attch F. Bid, Performance, Payment Bonds
Attch F1. SF24-16e.Bid.Bond (Blank)
Collapse Amendment 1Amendment 1
Collapse Amendment 2Amendment 2

© 2026 Unison Software, Inc. All rights reserved. Terms of Service and Use About FedConnect