Opportunity: Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and Quinn Creek Substation

Description 

NOTE: This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Email proposals WILL NOT be accepted. The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The Glendo-Lusk Rural Tap 115kV Transmission Line Upgrade and new Quinn Creek Substation projects aim to enhance WAPA’s ability to provide reliable and cost-efficient electric power, aligning with WAPA’s mission. WAPA benefits from the transmission line upgrades by resolving deteriorating conditions on the existing Glendo – Lusk Rural Tap 69kV line. The principal components of work include the following: Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) is proposing to upgrade 35 miles of its Lusk Rural Tap-Glendo (LRT- GLD) 69-kV transmission line to a 115-kV transmission line (Upgrade) in Platte and Niobrara counties, Wyoming and construct a new substation located in Niobrara County, Wyoming. The Upgrade starts at the Glendo Substation (GLD) and runs generally northeast for approximately 25 miles (25.4 miles). A new substation and delivery point named Quinn Creek Substation (QCK) will be constructed in this location. From the QCK Substation, the Upgrade will continue in a northeast direction for approximately 3 miles, it would then run east for approximately 6 miles and terminate at WAPA’s Lusk Rural Tap (LRT) just west of the town of Lusk. The Upgrade consists of replacing the LRT-GLD line with a new 115-kV wood pole H-frame transmission line. The new Quinn Creek Substation (QCK), with a 69-kV delivery point, will be constructed on about 5 acres on open rangeland. The Upgrade will be sectionalized into a 25.4-mile-long section called Casper (Pace)-Quinn Creek (CPL-QCK), a 9.4-mile-long Quinn Creek-Lusk Rural Tap (QCK-LRT) will be constructed to 115-kV specifications but operated at 69-kV for the near term. The Upgrade will be constructed on existing ROW, widened by 20 to 25 feet to provide proper clearance for the higher voltage, lengthened spans, and potentially greater blow-out. Location: Platte and Niobrara, 82213, 82227, 82225 Glendo Substation (GLD) - 524 Glendo Park Road, Glendo, WY 82213 Lusk Rural Tap (LRT) - Latitude: N 42° 46' 0"; Longitude: W 104° 28' 52"; Datum: NAD83/WGS84 Quinn Creek Substation - New Substation, approximately 25 miles Northeast from Glendo Substation The anticipated period of performance is 800 days calendar days after Notice to Proceed or by December 2028. The estimated magnitude of construction is greater than $10M. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M. The solicitation including specifications and drawings will be issued electronically on or about 1 June 2026 at the following sites: https://www.fedconnect.net and https://www.sam.gov. NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material. Please see the link for Construction Change Order Definitization Notices - https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx

Overview 
Reference number: 89503226BWA000073
Issue date: 04/28/2026
Response due: 07/03/2026 04:00 PM US/Eastern

Set Aside:
NAICS: 237130-Power and Communication Line and Related Structures Construction
PSC / FSC: Y1PZ-CONSTRUCTION OF OTHER NON-BUILDING FACILITIES

Agency: DOE

Contracting office:

Western Rocky Mountain Region
WAPA (RMR)
US DOE/Western Area Power
5555 E. Crossroads Blvd
Loveland, CO 80539-8986


Place of Performance:




Contact: John Pratt
Phone:
Fax:
Email: jpratt@wapa.gov

Vendors conference: 06/10/2026
10:00 AM

Location:

Glendo Substation

Details:

Site Visit RSVP: NLT 5 June 2026 (Must RSVP by this date if you intend to attend the pre-bid conference). Platte and Niobrara, 82213, 82227, 82225 Glendo Substation (GLD) - 524 Glendo Park Road, Glendo, WY 82213 Lusk Rural Tap (LRT) - Latitude: N 42° 46' 0"; Longitude: W 104° 28' 52"; Datum: NAD83/WGS84 Quinn Creek Substation - New Substation, approximately 25 miles Northeast from Glendo Substation



What do I do now?
This is the opportunity summary page. To the left you will see a description and an overview of this opportunity. To the right you will see a list of the attached documentation. To view any of the attachments, simply click the attachment name.



Registered Users
To register interest in this opportunity or to electronically respond, you must first sign in. Click the Sign In button below.





Non Registered Users
You can view this or any other public opportunity. However, registered users have numerous added benefits including the ability to submit questions to the agency, receive emails concerning updates and amendments, create and manage a response team and submit responses directly through this site.

Becoming a registered user is fast, free and takes only a few minutes. To get started, click the Register Now button below.

  




Documentation 

© 2026 Unison Software, Inc. All rights reserved. Terms of Service and Use About FedConnect